Manufacturing IT manager, evolve D365 F&O at the pace of your lines
Your generalist vendors don't master your manufacturing specifics: production, Master Planning, lot traceability, vendor EDI.
Manufacturing IT manager, evolve D365 F&O on production, traceability, vendor EDI and MES. 48-72 h delivery, €200 per resolved ticket.
The hidden cost of generalist SIs on manufacturing topics
- ✗Production Control, Master Planning and Warehouse Management are the least mastered by generalist SI profiles.
- ✗Custom developments on traceability (Inventory Batch / Serial) are routinely rushed — regulatory risk for your ISO / FDA audits.
- ✗Vendor EDI integrations (EDIFACT ORDERS, DESPATCH ADVICE) require weeks of setup for each new partner.
- ✗MES / SCADA interfacing stays artisanal: flat files, fragile integrations, no monitoring.
An AI trained on D365 F&O manufacturing modules
- ✓Native coverage of Production Control, Master Planning, Warehouse Management, Transportation Management modules.
- ✓Lot/serial traceability customization compliant with ISO 9001 and 21 CFR Part 11 (regulated industries).
- ✓Industry-packaged EDI connectors (EDIFACT, ANSI X12, GS1) with business-error handling — setup within 72 h per partner.
- ✓MES / SCADA integrations via OPC UA, D365 Business Events and Azure IoT — reusable patterns.
How it works
Submit your ticket
Describe the business or technical need in a few lines. No 50-page spec required.
AI generates the extension
X++ code, unit tests and documentation produced in under 48 hours.
Validation on your Azure DevOps
Pull request submitted on your repository. Your IT lead reviews and validates before merge.
Delivered — you pay €200
Once merged, it's delivered. No billing if the ticket isn't resolved.
Why it's worth it for you
Vendor EDI flow setup (EDIFACT ORDERS, DESADV, INVOIC) in 72 h instead of 3 to 6 weeks at a classic SI.
Lot/serial traceability customizations pre-validated for ISO 9001, ISO 13485 and 21 CFR Part 11 audits (life sciences).
Integration patterns with your existing industrial systems (Siemens, Schneider, Rockwell) via OPC UA and Azure IoT Hub.
Frequently asked questions
Does Skalp AI cover sector specifics (food, pharma, chemistry)?+
How do you handle integration with my existing MES / SCADA systems?+
What reversibility if I want to change approach in 2 years?+
Related pages
To go deeper on the same topic, seen from other angles.